RESPONSIBILITIES OF THE QUALITY CONTROL ENGINEER


RESPONSIBILITIES OF THE QUALITY CONTROL ENGINEER :-


Part 2

QUALITY-ENGINEER,QUALITY-ENGINEER-RESPONSIBILITIES
QUALITY ENGINEER




• Check the quality of all materials received on site.


• Check the stacking and storage of materials in various go downs and stores of the site systematically.


• Check the wastage of material at site.


• Checking of work and reporting it to the project manager.

• Before the commencement of a new activity, the quality control engineer should issue No Objection Certificate ( N. O. C) to ensure preliminary preparations of the different stages of the work related activities as per format.( Refere Format 2.1 )


 No-Objection-Certificate
No Objection Certificate ( N. O. C )
dd caption


a) Layout


b) Starta


c) R. C. C work


d) Masonary


f) Painting


g) Waterproofing


h) Plumbing


I) Development work, etc.


• Checking the safety measures.


• Observation of defects in materials received on site.


• Check building that are complete and ready for possession.


• Find solutions to practical problem faced during the execution of work for maintaining
optimum quality.


• Collect various suggestions from site engineers, analyze them and decide on the best alternative solutions, set up new quality control methods after discussion with the Directors.
December 30, 2018

RESPONSIBILITIES OF THE SENIOR ENGINEER (S.E)


RESPONSIBILITIES OF THE SENIOR ENGINEER (S.E) :-



Part 1

SR-CIVIL-ENGINEER,QUALITY-ENGINEER,SR-CIVIL-ENGINEER-RESPONSIBILITIES
SR.-CIVIL-ENGINEER



• Coordination between different agencies to ensure smooth working of the project.



• Maintain quality of work and control wastage of the materials of the site.



• Arrange the next days work in advance and ensure procurement of the material and labour.



• Discuss the practical problems faced during execution with P.M and find a suitable solution.



• Work out the quantities.



• Prepare requirement of the materials.



• Prepare the rate analysis of various items.



• Check the daily progress reports.



• Prepare necessary R.A. bills, cash bill, final bills, as per the work stage.



• Check any rectifications of structural and finishing work.



• Report to the Chief engineer in absence of project manager.



• Communicate all the necessary information from the senior staff to the junior staff.



• Visit Architects, Structural Consultants, any other outside offices as per instructions by Project manager or in absences of P. M.



• Remain present for all types of concreting work.



• Get the maximum output from the junior staff and the labourers.



• Maintain cleanliness of the site.


• Attend to the visitors and clients.