HOW TO CALCULATE QUANTITY OF PAINT FOR BUILDING:-

HOW TO CALCULATE QUANTITY OF PAINT FOR  BUILDING:-


Painting is one of the most essential steps to be done after construction of any building/house. Painting is done to protect the surface of the walls as well as to increase appearance.



PAINTER,PAINTING-CONTITY-CALCULATION,HOE-CALCULATE-PAINTING-QUANTITY
PAINTER


In this article, I will discuss how to calculate the quantity of paint required in a building.

Before starting the calculation let me tell you one important thing that quantity of paint is calculated in gallon.

There are two types of gallons

US gallon and Uk gallon.

1 US gallon = 3.785 litres

1 Uk gallon = 4.546 litres.

In this calculation we will use US gallon.

Let the length of the wall = 15 feet

The height of the wall = 12 feet.

Area of the wall 15 x 12 = 180 sft.

THUMB RULE FOR PAINT CALCULATION:

Generally, 1 gallon of paint can cover up to 350 sft area of wet wall and

1 gallon of paint can cover up to 200 sft area of dry wall.

PAINT QUANTITY OF WET WALL:

Area of wet wall =180 sft

Paint covered area = 300 sft

Quantity of paint = 180/350 = 0.514 litre.

Let the price of 1 gallon paint = Rs 1200.

Price of 0.514 gallon paint = 0.514 x 1200 =  617 Rs.

PAINT QUANTITY OF DRY WALL:

Area of dry wall = 180 sft.

Pain covered area = 200

Quantity of paint = 180/200 =0.9 gallon.

Price of 0.9 gallon paint = 0.9 x 1200 = 1080 Rs.

Note:

1. If the wall has any openings, subtract the area of openings from total area & then calculate paint quantity.
December 30, 2018

RESPONSIBILITIES OF THE STOREKEEPER


RESPONSIBILITIES OF THE STOREKEEPER :-


Part 2


STOREKEEPER,STOREKEEPER-RESPONSIBLITIES
STORE KEEPER




• Recored the store material receipts and consumption on daily basis.


• Checking the stock as per records.


• Receiving materials, stocking, recording of receipts, assisting the junior engineer to prepare quality reports of the received materials.


• Issue materials as per the indent for different works.


• General supervision on the site regarding wastage of material, improper use of material etc.


• Recollecting any balance/unused materials at the end of the working day.


• Handing over of the charge of material laying in the site premises to the night security personnel from the day security guards.


• Update records on display boards and display slates regarding the stock.


• Prepare fortnightly/montly consumption reports jointly with the Junior Engineer.


• Prepare the excess of material.


• Update the stock periodically.


• Inform the concerned engineer of the status of balance material in order to raise further indent.


• Follow up with material suppliers, with prior consent from purchase department, to ensure timely supply.


• Maintain records of department tools, machinery etc. On site.


• Maintain the records from cash purchase.


• Records of empty cement bags received from contractor.


• Maintain records of electricity and water bills.


• Inform the concerned engineer of the working condition of the machinery.
December 30, 2018

RESPONSIBILITIES OF THE QUALITY CONTROL ENGINEER


RESPONSIBILITIES OF THE QUALITY CONTROL ENGINEER :-


Part 2

QUALITY-ENGINEER,QUALITY-ENGINEER-RESPONSIBILITIES
QUALITY ENGINEER




• Check the quality of all materials received on site.


• Check the stacking and storage of materials in various go downs and stores of the site systematically.


• Check the wastage of material at site.


• Checking of work and reporting it to the project manager.

• Before the commencement of a new activity, the quality control engineer should issue No Objection Certificate ( N. O. C) to ensure preliminary preparations of the different stages of the work related activities as per format.( Refere Format 2.1 )


 No-Objection-Certificate
No Objection Certificate ( N. O. C )
dd caption


a) Layout


b) Starta


c) R. C. C work


d) Masonary


f) Painting


g) Waterproofing


h) Plumbing


I) Development work, etc.


• Checking the safety measures.


• Observation of defects in materials received on site.


• Check building that are complete and ready for possession.


• Find solutions to practical problem faced during the execution of work for maintaining
optimum quality.


• Collect various suggestions from site engineers, analyze them and decide on the best alternative solutions, set up new quality control methods after discussion with the Directors.
December 30, 2018

RESPONSIBILITIES OF THE SUPERVISOR :-


RESPONSIBILITIES OF THE SUPERVISOR :-


Part 1

CIVIL-SUPERVISOR,CIVIL-SUPERVISOR-RESPONSIBLITIES
CIVIL SUPERVISOR




Day-to-day supervision of ongoing construction work.


• Maintain proper labour force to complete the specified departmental work.


• Cooperate with the storekeeper by supplying labourers for unloading the material received on the site.


• Assist the Junior Engineer in technical checking of the ongoing work.


• Prepare a daily list of the department labour employed and allocation of the work, as instructed by the engineer.


• Check and control the wastage of material on site.


• Calculate the material requirement for a particular job.


• Coordinate with the respective agencies to keep up the speed of the project completion.


• Collect materials from supplier as per the instructions issued by the engineer.


• Supervise concrete block making work, inspect the quality of blocks and maintain the daily records of quality for casting of the blocks.


• Write the number and date of casting after de-shuttering of any concreted member.


• Assist the Junior Engineer in preparing daily reports, quality reports, bills etc.


• Check the cleaning regularly after the closing of the days work.


• Check the temporary water and electricity arrangement.


• Check and control unnecessary movements of outsides on the premise.
December 30, 2018

RESPONSIBILITIES OF THE JUNIOR ENGINEER (J.E)

RESPONSIBILITIES OF THE JUNIOR ENGINEER (J.E):-



JR.CIVIL ENGINEER 
Part 1



• Technical supervision of the ongoing civil work.


• Coordination with different contractors and agencies to maintain the project speed at the construction site.


• Control any wastage and improve quality of workmanship.


• Work out the requirements of different materials for construction.


• Prepare requisitions for different materials well in advance.


• Check the material received and prepare quality reports.


• Assist the Senior Engineer in maintaining quality of all civil work such as concreting, masonry, plastering,flooring etc.


• Collect department labour payment from Head Office and make payment to labourers with due receipts or Vouchers.


• Make quality check on the concrete blocks manufacturing along with their recordings.


• Communicate the necessary instructions to supervisors and departmental labours.


• Cash purchasing of the materials from market.




JR-CIVIL-ENGINEER,CIVIL-SUPERVISOR,JR-CIVIL-ENGINEER-RESPONSIBLITIES
JR CIVIL ENGINEER



• Prepare and sumit monthly Consumption reports, daily progress reports etc. With proper assistance from storekeeper and the supervisor.


• Assist the Senior Engineer in preparing bills of different contractors.


• Control store in Absence of the storekeeper.


• Raise memos to the concerned agencies for minor/major wastage occurred on site.


• Collect the drawing from the architect /structural consultant etc.


• Inform the Senior Engineer /Project Manger of any requirement of materials.


• Discuss technical problems/drawings and execution difficulties with the senior engineer/project manager.
December 30, 2018

RESPONSIBILITIES OF THE SENIOR ENGINEER (S.E)


RESPONSIBILITIES OF THE SENIOR ENGINEER (S.E) :-



Part 1

SR-CIVIL-ENGINEER,QUALITY-ENGINEER,SR-CIVIL-ENGINEER-RESPONSIBILITIES
SR.-CIVIL-ENGINEER



• Coordination between different agencies to ensure smooth working of the project.



• Maintain quality of work and control wastage of the materials of the site.



• Arrange the next days work in advance and ensure procurement of the material and labour.



• Discuss the practical problems faced during execution with P.M and find a suitable solution.



• Work out the quantities.



• Prepare requirement of the materials.



• Prepare the rate analysis of various items.



• Check the daily progress reports.



• Prepare necessary R.A. bills, cash bill, final bills, as per the work stage.



• Check any rectifications of structural and finishing work.



• Report to the Chief engineer in absence of project manager.



• Communicate all the necessary information from the senior staff to the junior staff.



• Visit Architects, Structural Consultants, any other outside offices as per instructions by Project manager or in absences of P. M.



• Remain present for all types of concreting work.



• Get the maximum output from the junior staff and the labourers.



• Maintain cleanliness of the site.


• Attend to the visitors and clients.
December 30, 2018

RESPONSIBILITIES OF THE PROJECT MANAGER


RESPONSIBILITIES OF THE PROJECT MANAGER


Part 1

CIVIL-PROJECT-ENGINEER,PROJEC-MANAGER,TEAM-LEADER
PROJECT ENGINEER



complete responsibilities of the smooth working of project.

• Coordination with architectural agency, Structural consultants

and other consultants for completion of the scheduled work in time and quality

• Keep an overall watch on the working of all technical or non-technical staff and getting the maximum output from the team.


• Attend program meeting,conference meetings, seminars or any meetings.


• Prepare bar chart, schedules of the project,prepare building wise schedules for quantities and material.


• Coordination between all the agencies involved to achieve continuous progress at work.


• Attend to all visiting clients,give them the necessary project information, guide them to the sales office and clarify any queries regarding extra amenity work.


• Check all the running account bills prepare by the senior engineer and submit them to the head office for further procedures.


• Submit the daily report of site to head office and report the progress of work to the chief engineer


• Collect the ' No Objection Certificate ' and record drawings with the help of different agencies involved, before handing over of the project to the society.


• Communicate the management desicions and information to the site subordinate staff.


• Maintain speed of project, as outlined by the management, without compromising only quality at any stage.


• Test the materials as per standard norms.


• Check any damage /rejected work and report it to the Chief Engineer.


• Deal with different government authoritities like P. W. D., Municipal Corporation, National Highway Department, Telephone Department etc.


• Inform the management of any new ideas/development/economy etc. and suggest methods of practical implementation for the same.


• Coordinate with all the relevant department in the head office i.e., Sales department, accounts department, purches departments, legal department, personal departments etc.


• Prepare the initial planning, costing, programming and set up of the new projects.


• Check , verify And correct all boundary markings,


• Carry out the theodolite and counter survey of total plot and prepare topographical maps.


• Collect all relevant information of surrounding projects that may prove useful in proper planning and designing of the project.


• Collect and send all the required technical data of soil investigation, water and other resources availability etc.


• Coordinate with the architect and other consultants for initial planning of projects.